Preparation and inspection of the air-cooled automatic tool change spindle motor before starting

Preparation and inspection of the air-cooled automatic tool change spindle motor before starting:
1. Check if the grounding of the starting equipment is reliable and complete, and the wiring is correct and good.

2. Check whether the voltage and frequency indicated by the nameplate of the air-cooled ATC spindle match the power supply voltage and frequency.

3. Check the relative phase and relative insulation resistance of the winding before starting the air-cooled ATC spindle with a new installation or long-term deactivation.

4. For the wound rotor, check whether the brush device on the collector ring can work normally and whether the brush pressure meets the requirements.

5. Check whether the air-cooled ATC spindle is flexible or not and whether the oil in the sliding bearing reaches the specified oil level.

6. Check if the rated current of the fuse used meets the requirements.

7. Check whether the fastening bolts and mounting bolts of the air-cooled ATC main shaft are tightened.

Buy the ATC spindle now:

9KW ATC Air Cooled Spindle Automatic Tool Change Spindle ISO30 220V 380V for CNC Router

7.5kw ATC Air Cooled Spindle Automatic Tool Change spindle ISO30 380V for CNC Router

4.5KW ATC Air Cooled Spindle Automatic Tool Change Spindle ISO30 220V 380V for CNC Router